Projects : PPL Brunner Island IP Turbine Replacement

  • Redesigned main steam & reheat lines to accommodate a change from fixed to “floating” valves
  • Designed reheat / extraction piping layout modifications – redesigned supports as necessary
  • ASME B31.1 piping code analyses
  • Confirmed turbine nozzle loads & stability are within OEM (Siemens) requirements
  • Modified all drains, leak-offs and gland steam lines


Unit 2 MS Piping Algor Analysis Model


Steam Chest w. Spring Supports & Snubbers