|
|
Projects
: PPL Brunner Island IP Turbine Replacement


- Redesigned
main steam & reheat lines to accommodate a change from fixed to
“floating” valves
- Designed
reheat / extraction piping layout modifications – redesigned supports
as necessary
- ASME
B31.1 piping code analyses
- Confirmed
turbine nozzle loads & stability are within OEM (Siemens) requirements
- Modified
all drains, leak-offs and gland steam lines

Unit 2 MS Piping
Algor Analysis Model

Steam Chest
w. Spring Supports & Snubbers
|
|